 |
1011 backing down the main to the train. |
 |
Making the joint. |
 |
Lacing up the hoses. |
 |
Opening air valves. |
 |
Plugging in the M.U. cable. |
 |
Our train is now complete. |
 |
Testing the sanders. |
 |
Onboard crew consultation. |
 |
Air test. |
 |
Souvenir shot of me warming up the engineer's seat. |
 |
Westbound. |
 |
Interior view - Trevor. |
 |
Trevor converses with the engineer. |
 |
We've dropped our train at Malone and headed light to Lost River for a facing movement. At Lost River, we pop into the spur to pick up some cars from the Winema elevator. |
 |
Heading back to Malone, passing stored centerbeams at Merrill. |
 |
Entering Malone. |
 |
We've pulled the covered hoppers we picked up at Lost River into the siding at Malone. |